skip to main | skip to sidebar

Hydroplane

Monday, February 11, 2008

12. Water-proof Process

Water-proof is an important process before painting. All the surfaces, and also the connection edges and holes, have to be filled with water-proof materials.


Posted by SMJH at 8:49 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (16)
    • ▼  February (16)
      • 16. Interaction with Audiences
      • 15. Complete the Static Model
      • 14. Painting
      • 13. Undercoating
      • 12. Water-proof Process
      • 11. Greasing
      • 10. Advisor
      • 9. Inspiration
      • 8. Rudder
      • 7. Molding the Prow
      • 6. Assemble the Hull
      • 5. Inhale Mantle
      • 4. Handcraft the Feet
      • 3. Wood Plates, by Laser Cutter
      • 2. The Design
      • 1. Scambi - A Speedy Boat
  • Nova Class Enterprise
  • 成長的軌跡
  • 飛行種籽 Soaring Eagle

About Me

SMJH
View my complete profile